Capitol Corridor
University of California
Capitol Corridor

Phase 3 complete in Kearney solar energy project

JKB Energy has completed three phases of a solar energy project at UC ANR Kearney Agricultural Research and Extension (KARE) Center in Parlier. The system eliminates thousands of pounds of emissions and saves the center tens of thousands of dollars in energy costs annually, according to a JKB Energy news release. Kearney is one of nine research and extension centers located throughout the state that are part of the University of California Division of Agricultural and Natural Resources (UC ANR).

JKB Energy has worked with Robert Ray, superintendent of the UC ANR KARE physical plant, to maximize their bill offset program. Since 2012, when the program started, UC ANR KARE has steadily cut its energy costs.

After the completion of the final phase, projected for 2016, the center's “postharvest” meter's annual electricity costs will be offset by approximately 96 percent. Postharvest research is science conducted after a crop has been harvested and includes such processes as of cooling, cleaning, sorting, and packaging and how these might affect the quality of stored fruits and vegetables.

According to JKB Energy, over 25 years, this project will eliminate the equivalent of:

  • 473,735 pounds of carbon dioxide, the leading greenhouse gas
  • 1,520 pounds of nitrogen dioxide, which creates smog
  • 1,376 pounds of sulfur dioxide, which causes acid rain
  • 94 pounds of particulates that cause asthma
  • 770,814 miles driven in an average car

The system is the equivalent of taking 2.5 cars off the road for 25 years, or planting 4.1 acres of trees. 

The solor array at Kearney is at the bottom of the photo.
Posted on Friday, July 17, 2015 at 3:49 PM

No Comments Posted.

Leave a Reply

You are currently not signed in. If you have an account, then sign in now! Anonymously contributed messages may be delayed.




Security Code:
WRVYDF
:

Read more

 
E-mail
 
Webmaster Email: kmchurchill@ucanr.edu